Project: bbellamy   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Brad Bellamy   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1890.7
Total Flight Time:
Start/Last Date:Jan 01, 2001 - No Finish Date
Engine:IO-360
 
Friendly URL: https://eaabuilderslog.org?s=bbellamy

Home or Last Project Picture

Jun 13, 2022     Landing Gear Weldments, Electrical Design and Documentation - (2.5 hours) Category: Fuselage
Cleaned up weldments with MEK to remove sharpie marks. Cleaned up fuselage and test installed weldments. Checked alignment of wiring feedthrough holes and realized I have more filing before I can do the final install. Plan to use the SB625-8 instead of the SB625-7 for the wiring bushings to gain extra space.

Worked with Excel spreadsheet and decided how to show connections and use vLookup formulas to reduce effort and chance of mistakes.

Cut and pasted more connector information into a numbers spreadsheet for transfer to Excel. Completed entry for G5, GTX45R, GNC255, GTR200, GSA28, GMU11, GEA24, GMC507, GSU25, GTP59 and GMA245. That might be all of the avionics. Now to figure out which ones to connect... Lots of wires...
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.